BioMass Equipment For Sale
597 Results Found
Call for Price
Call for Price
This system will be ready for removal around January 2025. Removal, transport and installation is available. System was totally rebuilt in 2024. - Heil 12’x40’ Triple Pass Rotary Drum dryer. Maximum water evaporation is 16 tons per hour. - 3MM-60MM BTU Natural gas burner. New controls, new gas train, controls are integrated to the whole system. - 12’X36’ Cyclone with stand. - Air lock for cyclone. - 250hp Fan for drum. - All ductwork is included and stainless steel. - (3) 30”x50’ Crescent top belt. UHMW wear plates under the belt. Bottom return roller. Self-cleaning rollers on drive and idle pulleys. - (1) 30”x20’ Crescent top belt. UHMW wear plates under the belt. Bottom return roller. Self-cleaning rollers on drive and idle pulleys. This belt will run in FWD or REV it would go under the airlock. - 40’X16” Leveling auger with frame. - System includes: All controls for the burner and drum. All electrical to run the system including HMI, Mod HMI mirror to 55” TV, camera system to monitor the entire drying operation. System can be run and monitored by 1-man.
Call for Price
12'x42' Triple Pass Drum 20 MM BTU Webb Burner Burner feed bin Burner blowers Blower to pull shavings through drum Cyclone BMM 3-level Shaker Screen (2) Outfeed Conveyors Electrical controls
Call for Price
Heil 10.5' x 32' Triple Pass Drum Dryer 1. Jackson Harvester Burner 24 million BTU 2. Fuel Bin 3. Pipe and fan from fuel bin to burner 4. Air lock on dryer 5. 8 X 24 3 pass dryer 6. Trunnions 7. Fans to dryer 8. Pipe to cyclone 9. Cyclone 10. Pipe to fuel bin 11. Fan moving sawdust to fuel bin 12 Hog with 200 HP motor 13 Dust collection system
Call for Price
Heil 15x32 Triple Pass Drum Dryer 8-10 TPH Drying Capacity Webb Burner Complete Dust Collection All Electrical & Controls 200 HP Wood Hog
Call for Price
Confirming it is a Heil system. Seller is not sure. Actual dimensions: 42' x 10'6" Triple Pass Drum
Call for Price
Confirming it is a Heil system. Seller is not sure. Actual dimensions: 42' x 10'6" Triple Pass Drum
Call for Price
Call for Price
$ 325,000
HogZilla TC 1564-P Tub Grinder 4200 Hours 1200 HP Detroit V16 Engine Spare Computer New Shear Bars Several New Hammers and Bits Off The Road Pull Out Truck Included
$ 165,000
Hogzilla TC 1464 Tub Grinder -700HP KTTA19 Cummins -3-Stage Twin Disk Torque Converter -Roughly 6500 hours -Tires are good -Belts in good shape On the job working
Call for Price
24" x 60' Hoover Radial Stacking Conveyor with scales, catwalk & hand railing, 15hp motor running @ 400FPM, 100TPH, @60PCF Material. Scale Includes ThermoFisher Series 10-17-4 Belt Scale + 9101 Integrator. Only 260k tons lifetime use Used inside building since new. price includes loading freight rates available upon request
Call for Price
Feeder hopper with 85ft Superior belt conveyor, Mclanahan cross belt sampler 24" x 85' Transfer Superior Conveyor with 15hp Motor running at approx. 400FPM, 100TPH, @60PCF Material. Comes with McLanahan 24" cross Belt Sampler: LHD 18" Wide Enclosure 2-7/16" Dia Shaft, 6" Wide Cutter. 260k tons lifetime use and hopper conveyor. Sampler available separately.
Call for Price
HURST 205 HP / 6.9mm BTU / 15 PSIG WET WOODY BIOMASS FIRED BOILER/STEAM PLANT: -- Specifications: Complete in-place system with the following features: -- 205 HP Biomass Wood Fired Boiler, 7,073 PPH, gross steam output @ 212° F. -- Low Pressure "Fire Tube" design fire box model FB-1332-15-UF, built in accordance with ASME Code. -- Operator Interface:Allen Bradley PLC with Power Supply Rack. Pentium-based computer with network & modem remote communication capabilities with operator interface software. -- RSView Runtime for automatic operating of the steam pressure, temperatures, fuel flow & combustion airflow. -- The control system incorporates a 4-20 milliamp steam pressure transmitter to sense any changes in steam flow, boiler pressure, & regulates the fuel feed & combustion airflow accordingly. -- Complete with:Additional details on file for the scope of this Complete System's original project.NOTE: Building that houses Boiler can be included with Boiler if desired by Buyer.
$ 550,000
HURST 600 HP Waste Fired Boiler; -- Specifications:Complete in-place system with the following features: -- Decommissioned July 2019. -- 150 PSI. (300 PSI max wp), -- 20,700 Lbs per hour. -- Fuel House, Boiler Building and all Controls -- System has been "pickled" to maintain tube integrity.
Call for Price
Call for Price
HURST SERIES 45 207.5 HP 60 PSI HOT WATER NATURAL GAS FIRED FIREBOX: -- Specifications:Built New in 2016...Complete, never installed & ready to deliver! -- Efficient 3-Pass Design NATURAL GAS FIRED FIREBOX -- ASME Code Constructed & Stamped for 15 PSI Steam / 30-100 PSI Water -- Registered with the National Board of Boiler Inspectors -- Easily Maintained, Designed for Efficiency, Large Furnace Volume for Ultimate Combustion Efficiency -- Unified Refractory Base Floor, Steel Skids and Lifting Eyes -- Low Heat Release, Factory Insulated – 2"; Mineral Wool, Factory Jacketed & Painted -- Easy Access to Fireside Surfaces n Ample Waterside Clean-Out Openings -- Fully Automatic Operation, U.L. Listed, Forced Draft Burners -- Wet Back Construction -- U.L. Listed Controls & Trim -- Factory Test Fired, Flame Observation Ports Front & Rear.BOILER DESIGN: Three-Pass “FireBox"; design with stress relieving “Wetback"; Firetube construction. Hot Water pressures models are from n 8.5-415 HP } 100 psi. max. n 500-813 HP } 60 psi. max. Built to Section-IV ASME Code. Hot water temperature not to exceed 250° degrees F. at or near the outlet of boiler.HOT WATER MODEL TRIM: Safety relief valve, operating temperature control, high limit temperature control with manual reset, combination pressure & temperature gauge, low water cut-off control with manual reset.HOT WATER SUPPLY: 180 D/F RETURN: 160 D/F -- FIRESIDE HEATING SURFACE: 830 SQ.FT. FURNACE VOLUME: 132 CU. FT. HOT WATER OUTLET: 8", HOT WATER RETURN: 6", DRAIN CONNECTION: 2".BURNER: Matched UL listed “forced draft"; power burners with factory pre-piped, wired and tested fuel configurations for natural gas, propane (LP) gas, No. 2 (diesel) oil, or combination of both gas/oil.All units are factory packaged with operating controls, relief valves, burner and fuel train. Installation is made simple in that only service connections are needed to place in operation.High density 2"; mineral wool insulation assures lower radiant heat loss. In addition to meeting the requirements of U.L., burner systems are optionally available to meet the requirements of FM, IRI, MILITARY and others. -- Actual Model is HURST S45 – G – 207.5 – 60W
Call for Price
1989 Hurst Wood Waste Fire Boiler System MDL 710 W/Water Tank Condensate Tank, Infeed Auger, Ash Removal Unit, Controls, 150 PSI, Max WP PSI 975, 5, 175 lbs Steam Per HR & S/N HYB-150-2
HUSTLER - FC-2, ...ScreenSpecifications: -- OD at the longest point: 104" -- Long at longest point: 122" -- Tall at the tallest point: 65"Equipped with: -- (2) Shutoff switches
$ 47,900
Hydro-AX 621 Cummins No leaks Mower No cracks or welds 6734 hours 28L tires in good shape Machine is clean